Here are photos showing the progress that Ryan and James have made in the transformation of my master bathroom.                         I am impressed with their work and attention to details.

There are only a few floor tiles yet to be laid in the toilet area which I believe will be completed on Friday, 11.6.15. Installing the vanity, countertop, wash basins, faucets and lights should be soon to follow - hopefully yet this week. 

I have MAJOR dust to clean up after this is done. It is EVERYWHERE, but mostly confined to the master bedroom since I kept that door closed during most of the construction / destruction. 


Below is how the room looked at the end of Saturday, Oct. 31, 2015:

Below shows the progress at end of the day Thurs. 11/5/15: